QUALITY
STANDARDS
ISO 9000
quality system is in place and all products and tested
fully assembled before dispatch to site. Premium quality
componants are used in all constructions, resulting
in a product designed for lifetime useage.
ACCREDITATIONS
ISO9001/2000 BSI/UKAS Accredited, Certificate number: FM85745
We also build and install security doorsets to HM Government security standards.
SERVICE
Our company
are pleased to supply only our products and willwork
closely with main contractors to ensure a 'right first
time' quality, but we prefer to take responsibilty
ourselves for installation to ensure complete customer
satisfaction.
CONSTRUCTION
By using
different matrices and cores of the highest quality
hardwood lamets, redwood, hardwood, plywood and dissimmiler
materials including carbon, hardened, martensitic
and manganese steels, opaque armour, lead sheets and
other inert
components, the performance required can be achieved.
FINISH
The manufacturing
process, including the hot press, allows for a variety
of finishes to be provided. These include all available
hardwood veneers with matching on leaves and overpanels,
plastic laminates, raised and fielded panels, applied
mouldings, flush panels and complete steel envelopes,
all of which are decorated to the clients specification.
Additionaly door blanks of up to 1.5m wide and 3.0m
high can be bonded in one piece.
GLAZING
Door
vision panels are fabricated and internal security
fixed, being glazed with the appropriate thickness
of either laminated glass, polycarbonate or a combination
of the two.
LOCKING
Most
specialist heavy-duty multriple bolting systems are
fitted to the security doorsets . All other forms
of locking are applied, including electrical units
with cable runs hidden in the dor cores, all for connection
to alarm or access control systems and close alarm
wiring and radio antenna hands free.
The final process in the manufacturing stage involves
each door being fully checked and operated in teh
test rig before despatch.
INSTALLATION
The company's
own installation service will ensure a complete installation
but supply only contracts are also welcome.